Feed Mill Relocation &
Re-Commissioning Program

A precision engineering program to preserve asset value. We relocate fully-functional feed mills, re-engineer layouts for new sites, and recommission to original performance standards.

Project Type Plant Relocation
Client Industrial Operators
Goal Value Preservation
Outcome Verified Performance

More Than Moving Metal

Feed mill relocation is one of the highest-value engineering tasks: critical precision is required to preserve equipment integrity, maximize reuse, and avoid costly rework. It is a highly engineering-driven delivery model — not a simple logistics job.

Minimized CAPEX via Reuse
Faster Time to Operation
Performance Verified Under Real Load

Delivery Criticality

Engineering Recovery Mission

Asset Condition Assessment
Layout Re-Engineering
Full Re-Commissioning

Integrated Delivery Scope

Pre-Relocation Engineering

  • • Site assessment (Origin & Destination)
  • • Geotechnical & structural analysis
  • • Layout re-engineering for new footprint
  • • Updated interface drawings

Dismantling & Preservation

  • • Systematic tagging of all equipment
  • • Controlled disassembly (Silos/Elevators)
  • • Preservation packing (Coatings/Supports)
  • • Component traceability logs

Transport & Logistics

  • • Specialized heavy-haul transport
  • • Route planning & permitting
  • • Real-time transit monitoring
  • • Site arrival & staging plans

Re-Installation & Integration

  • • Foundation adaptation
  • • Mechanical, electrical & pneumatic re-assembly
  • • Alignment with new plant systems
  • • Interface coordination

Commissioning & Verification

  • • Functional & load testing
  • • Process performance verification
  • • Operator training
  • • Handover documentation

Engineering Techniques & Methods

Decision-Driven Engineering

  • • Predictive alignment
  • • Tolerance mapping
  • • Critical lift engineering

Execution Control

  • • Sequencing linked to risk register
  • • Weekly look-ahead planning
  • • Structural verification logs

Commissioning Discipline

  • • Dry runs before material intro
  • • Interlock safety verification
  • • KPI-based acceptance

Standards & Compliance

Relocation projects follow relevant codes and best practices. Compliance is not checkbox-based — it is engineered into the relocation plan.

Mechanical Alignment Electrical Isolation Rigging & Lifting Manufacturer Guidelines

Relocation in Action

We Don't Move Machines.

We give them a second life. Plan your relocation with engineering confidence.